Fengyuan’s published MOQ is 12,000 pieces per model. Before planning an order, confirm how color, decoration and component variations are counted, then align the quantity with the approved sample, filling plan and written quotation. A model-level MOQ does not by itself confirm the minimum for every variation.

This guide explains how to prepare a project around the 12,000-piece MOQ, what information to confirm before requesting a quote, and how the selected specification affects sample review and production planning.
What does 12,000 pieces per model mean?
The quantity is counted against a model, rather than being pooled across every package in a product launch. A 12,000-piece order for one selected tube model is a different scope from a launch that splits the same total across multiple tube designs. If you are comparing shapes or capacities, identify each candidate model and ask for its MOQ and price at the quantity you expect to order.
Also list any variants that affect production planning. These may include the body and cap colors, the printing or decoration you want, and any packaging requirements. Do not assume that an order quantity for one model automatically covers another model or a separate finish. Ask the supplier to show the confirmed quantity and specification together in the quotation.
Which specifications must be fixed before comparing quotes?
A useful quotation request gives the supplier enough information to identify the package and the work required. Start with the product page or model number when available. Add the intended capacity, body shape, material if known, applicator style, color, logo method and expected quantity for that model. If a specification is still open, mark it as undecided instead of guessing.
This detail helps you compare like with like. Two quotations may refer to tubes that look similar in a photograph but use different capacities, applicators, finishes or decoration processes. Ask each supplier to confirm the parts included, the requested decoration and the quantity used for its price. Keep approved drawings, artwork and sample notes with the quote so your team can review the same specification later.
For model ideas, browse the lip packaging range. If you already have a preferred format, include its page link in your enquiry.
Review a sample before approving the production specification
A sample gives your product team a physical package to inspect. Check the cap fit, applicator shape, package dimensions, surface appearance and how the components feel together. If your formula or filling process may affect package selection, have the relevant product and filling teams assess the sample for their intended use. A package description or photograph alone cannot confirm formula compatibility.
Record any changes you want before the production specification is approved. For example, note whether the color needs adjustment, whether a logo position should move, or whether the selected applicator needs another review. When the supplier sends an updated sample or written specification, compare it with your notes and confirm which version is approved.
You can request lip gloss tube samples to review a format before finalizing the production brief. Include the model or page link and describe what your team needs to evaluate.
Plan the production schedule
Mass production typically takes 25–35 days after order details and samples are approved. The schedule for a specific project should be confirmed with the quotation, because the approved specification and production arrangements form part of the project plan. If you are working toward a launch date, share that date when you request the quote and ask the supplier to confirm the expected production window and shipping plan separately.
Keep production time distinct from sample review and transit time. A calendar for a launch may include several steps: specification discussion, sample review, approval, production, inspection and transportation. Ask which steps are included in the date range the supplier provides, and record any assumptions in the order documents.
Prepare a clear request for quotation
Before contacting a supplier, collect the key project details in one message:
- The model number or product page link for each tube.
- The capacity and package format you want to evaluate.
- The quantity planned for each selected model.
- The intended colors, logo artwork and decoration method.
- Any sample or specification questions that need a response.
- Your destination market and target delivery date.
- The artwork file or reference image, if it is ready to share.
If you do not have every detail yet, send the information you have and identify what remains open. The supplier can then respond with questions that help complete the specification. Before approving a quotation, check that it names the correct model, quantity, decoration scope, price basis, production schedule and shipping assumptions.
Compare quotations on the same order basis
A unit price is useful only when the specifications and quantities match. When comparing suppliers, check whether each quote is for the same model, capacity, material, applicator, color, logo method and packaging scope. Confirm that each price uses the planned quantity per model and ask whether any separate setup or finishing requirements apply to your selected decoration.
If a quotation shows a quantity below 12,000 pieces for a Fengyuan lip gloss tube model, ask for written confirmation of the product, order scope and applicable terms before relying on it. The current standard MOQ stated for these orders is 12,000 pieces per model. A sample request is a separate step from a production order, so do not treat a sample as confirmation of a lower production MOQ.
Frequently asked questions
Is the 12,000-piece MOQ shared across different tube models?
No. The stated MOQ applies per model. List each selected model and the quantity planned for it in your enquiry.
Should I decide colors and decoration before requesting a quote?
Share your current plan, including colors and logo or printing requirements. If something is not decided, mark it as open and ask the supplier to confirm the options and any effect on the quotation.
How long does mass production take?
Mass production typically takes 25–35 days after order details and samples are approved. Confirm the schedule for your model and keep sample review and shipping time separate in your project calendar.
What should I send with my enquiry?
Send the model or product link, target quantity per model, capacity, requested color and decoration, artwork if available, destination and target date. You can contact Fengyuan with your requirements.
The clearest way to plan a lip gloss tube order is to confirm the package model, the 12,000-piece MOQ per model and the approved specification together. With those details aligned, your team can compare quotations, review samples and plan production against a written schedule.
Which evidence should support the final packaging decision?
Use the chosen model’s drawing, component list and approved sample as the project record. For the safety-assessment context of packaging in contact with cosmetics, consult the EU guidance on the cosmetic product safety report. This regulatory reference is not a test result or approval for a particular Fengyuan model.
What is the next step for your packaging project?
Browse the relevant packaging collection, review customization options, and request a model-specific sample. Send the model reference, intended formula or format, quantity and any open questions so the response can address your actual order.
Publisher: Fengyuan · Existing article credit: Fengyuanbeauty · Content updated 18 November 2026. Product and company details should be checked against the company profile and current written specification; sample checks are project-specific.